Week 5 Progress
This Week I have focused on refining the bike paths. I have decided that there will be two main paths - one that emerge from Waterhen Dr. and leads to the top of the coal loader and loops back, and one that passes through one of the tunnels and continues to Balls Head Drive.
No comments:
Post a Comment